Rave in the Afternoon

Role

Production Assistant
Scriptwriter

Structure
As Live

Duration
14' 20"

Format
1080p

Description:

Our first project on the Broadcast Operations course at Ravensbourne required us produce a studio-based, recorded 'as live' programme.

Following 7 and a half weeks of pre-production we went for live TX at 3:18pm on December 16 2010. The show was shot in 1440x1080 50i, but deinterlaced and converted to 1920x1080 50p for online upload (using Apple's 'Compressor').

I was heavily involved in the pre-production phase of the show, as Scriptwriter and PA. My role as PA on the day of the 'live shoot' was very demanding, requiring me to keep track of all timings. The show was exactly 14' 20" in length.

My Role:

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.


Get Flash Player